Title: Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG-DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis of low bid(s) to Brice Construction & Design, LLC in the amount of $29,387,654 for channel conveyance improvements to Taylor Gully and Woodbridge Stormwater Detention Basin for the Flood Control District and for the County Clerk to execute any applicable bonds to be received (260025), MWBE Contracted Goal: 29.38%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): 260025
Vendor/Entity Legal Name (if applicable): Brice Construction & Design, LLC

MWBE Contracted Goal (if applicable): 29.38%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG-DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis of low bid(s) to Brice Construction & Design, LLC in the amount of $29,387,654 for channel conveyance improvements to Taylor Gully and Woodbridge Stormwater Detention Basin for the Flood Control District and for the County Clerk to execute any applicable bonds to be received (260025), MWBE Contracted Goal: 29.38%.
end

Background and Discussion:
The Taylor Gully Channel is in the north-eastern part of Harris County, Texas. The project limits of the proposed Taylor Gully Channel Improvements stretch from the Montgomery County boundary on the west to approximately 700 feet upstream of the confluence with White Oak Creek (G103-80-03.1) for a total length of approximately 12,630 linear feet. Additionally, there are two adjacent Flood Control owned properties (Woodridge site G503-06-00) in Montgomery County that are designated for stormwater detention and for mitigation of impacts from the channel improvements. Except for the two detention basins, the project is within the City of Houston limits.
The project consists of approximat...