Harris County Commissioners Court
Request for Court Action
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 250332
Vendor/Entity Legal Name (if applicable): MB Western Construction Co.
MWBE Contracted Goal (if applicable): 27.85%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Choose an item.
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to MB Western Construction Co. in the amount of $10,482,548 for Regional Stormwater Detention Basin (Phase 1) at Forest Green for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250332), MWBE Contracted Goal: 27.85%.
end
Background and Discussion:
The purpose of this project is to lower water surface elevations within the Q134 subwatershed to reduce existing flooding issues. The Q134 watershed has a history of flooding, with recorded damages dating back to the 1970s and several significant flooding events within the last decade.
The construction of the Regional Stormwater Detention Basin (Phase 1) at Forest Green will provide immediate benefits by reducing water surface elevations and the resulting inundation area during high intensity rain events. This project sets the foundation for subsequent phases to expand the project into a regional detention basin and channel improvements with the ultimate goal of providing system capacity for the 100-year rainfall event.
Expected Impact:
N/A
Alternative Options:
N/A
County Strategic Plan Goal: 5. Minimize the impact of climate change and disasters.
County S...