Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN - 18104MF0RA01
Vendor/Entity Legal Name (if applicable): Scientech Engineers Inc
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a study report prepared by Scientech Engineers Inc for Holderrieth Rd Segment 3 - from Hufsmith-Kohrville Rd to Sir Alex Dr - 2017, UPIN 18104MF0RA01, Precinct 3.
end
Background and Discussion:
This project consists of upgrading Holderrieth Road to a standard four (4) lane concrete boulevard in 100-foot ROW with a 20-foot raised median and underground storm sewer system for the limits from Hufsmith-Kohrville Rd to Sir Alex Dr - 2017,connecting the existing Champion Forest pavement sections. The project includes two (2) detention basins, interlocal agreements with developers and Municipal Utility Districts, sidewalks, right-way acquisitions, utility relocations and street lighting. This project was a part of redistricting from Precinct 4 to Precinct 3. As a result, while the study phase for the project began in 2017, completion of the study phase was completed in 2026 due to its reclassification and re-scoping.
Expected Impact:
The project will improve the east-west vehicular mobility for the local community, connecting the Champion Forest existing road sections to major thoroughfares and state highways.
Alternative Options:
Without this project, this road segment will continue operating under th...
Click here for full text