Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Interlocal Agreement
Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): Harris County MUD No. 514
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Exempt - Interlocal/Cooperative Agreement
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an interlocal agreement with Harris County Municipal Utility District No. 514 for maintenance of certain non-standard drainage facilities in connection with Sila Drive Street Dedication and Reserves Sec 2 (HC Project No. 2406130087), Sila Drive Street Dedication and Reserves Sec 3 (HC Project No. 2409040195), Sila Lago Cecita Drive Street Dedication (HC Project No. 2501140172), Sila Sec 12 (HC Project No. 2501170100), and future Sila Sections 15, 19, 20, and 21 and wetland crossings and related appurtenances that will be designed to drain toward a wetland mitigation area to be constructed within the existing right-of-way of Sila Drive, Sila Lago Cecita Drive, and Sila Sections 12, 15, 19, 20, and 21 located west of Huffman Cleveland Road, south of Northwood Country Road, east of East Fork San Jacinto River, north of Blue Lake Drive, Precinct 3.
end
Background and Discussion:
The approved Drainage Impact Study (HC Project No. 2409030031) shows runoff from these proposed roads and sections recharging the existing wetland mitigation area. By allowing the MUD to maintain the drainage facilities for these projects, we can design to the expectatio...
Click here for full text