Legislation Details

File #: 26-1218    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 2/11/2026 In control: Commissioners Court
On agenda: 2/26/2026 Final action: 2/26/2026
Title: Request for approval of a change in contract No. 5 with Allgood Construction Company, Inc., for the White Oak Bayou Federal Flood Damage Reduction Project, adding 41 calendar days (White Oak Bayou Watershed, Bond ID C-14, Project ID E100-00-00-E007, Job No. 23/0115, Precinct 1, MWBE Contracted Goal: 26%, MWBE Current Participation: 11.25%).
Attachments: 1. 022626 CIC E100-E007 PCT 1 backup.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): E100-00-00-E007
Vendor/Entity Legal Name (if applicable): Allgood Construction Company, Inc.

MWBE Contracted Goal (if applicable): 26%
MWBE Current Participation (if applicable): 11.25%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract No. 5 with Allgood Construction Company, Inc., for the White Oak Bayou Federal Flood Damage Reduction Project, adding 41 calendar days (White Oak Bayou Watershed, Bond ID C-14, Project ID E100-00-00-E007, Job No. 23/0115, Precinct 1, MWBE Contracted Goal: 26%, MWBE Current Participation: 11.25%).
end

Background and Discussion:
This change in contract is needed to complete the construction contract for this project. Federal Flood Control Project Channel Modifications Discrete Segment 104 White Oak Bayou Cole Creek to Hollister Street includes the installation of approximately 1.65 miles of 10-foot to 12-foot width concrete sidewalk bike trails, concrete sidewalk pedestrian access paths and wheelchair ramps, and excavation and re-grading approximately 4.65 miles of drainage channel, including installation of backslope swales. The purpose of this contract change is to increase the quantities of several pay items that have exceeded current contract amounts, add new pay items needed to complete the work, and reduce quantities for items that are no longer required. The contract change includes 41 Calendar Days and no increase to the budget.


Expected Impact:
This ch...