Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Lesley Briones
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): 25104MF3TY01
Vendor/Entity Legal Name (if applicable): Entech Civil Engineers Inc
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable):N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable):N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a study report prepared by Entech Civil Engineers Inc for Study - Neighborhood Drainage Improvements (Phase 1) - 2025, UPIN 25104MF3TY01, Precinct 4.
end
Background and Discussion:
The project consists of conducting a Precinct 4-wide desktop analysis to identify areas within the right-of-way (ROW) that may benefit from drainage system maintenance and/or improvements. Findings of the drainage assessment will be used to determine follow-on maintenance work, projects, or additional detailed studies.
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of flooding in various locations across Precinct 4. This study report presents recommended options for impactful maintenance projects to reduce flood risk.
Alternative Options:
N/A
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H1: Complet...