Legislation Details

File #: 26-1055    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/2/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval of an agreement with Westwood Professional Services, Inc., in the amount of $1,304,786 to provide preliminary engineering services in support of the Cypress Park Stormwater Detention Basin Extension on Cypress Creek for flood damage reduction as part of the Cypress Creek Program Implementation Plan (Cypress Creek Watershed, Bond ID Z-04, Project ID K500-01-00-E005, Agreement No. 2024-56, Precinct 3, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 19.60%).
Attachments: 1. 021226 AGMT WESTWOOD 2024-56 PCT 3 backup.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): K500-01-00-E005
Vendor/Entity Legal Name (if applicable): Westwood Professional Services, Inc.

MWBE Contracted Goal (if applicable): 19.60%
MWBE Current Participation (if applicable): 19.60%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an agreement with Westwood Professional Services, Inc., in the amount of $1,304,786 to provide preliminary engineering services in support of the Cypress Park Stormwater Detention Basin Extension on Cypress Creek for flood damage reduction as part of the Cypress Creek Program Implementation Plan (Cypress Creek Watershed, Bond ID Z-04, Project ID K500-01-00-E005, Agreement No. 2024-56, Precinct 3, MWBE Contracted Goal: 19.60%, MWBE Current Participation: 19.60%).
end

Background and Discussion:
The recommended alternative from a Cypress Creek Program Implementation Plan (K100-00-00-P007) helps to mitigate overland sheet flow, overbank flooding, insufficient drainage capacity, overflows from neighboring catchments, and tailwater influence from Sims Bayou. This agreement will provide preliminary engineering (PER), design, and construction phase services for North Eldridge Parkway and Cypress Park in Precinct 3. This project has been identified in the Cypress Creek Implementation Plan, and the PER associated with this project will determine the benefits and geometry for the proposed stormwater detention basin.

Expected Impact:
The scope of this project is to prepare a preliminary engi...

Click here for full text