File #: 26-1054    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 2/2/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval of amendment No. 1 to an agreement with Fivengineering, LLC dba 5engineering, in the amount of $150,000, to provide additional engineering consulting services to augment the Flood Control District's staff for drainage report reviews (Project ID Z100-00-00-P031, Agreement No. 2023-52, Countywide, MWBE Contracted Goal: 19.6%, MWBE Current Participation: 100%).
Attachments: 1. 021226 AGMT 5ENINGEERING 2023-52 CW backup.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Z100-00-00-P031
Vendor/Entity Legal Name (if applicable): Fivengineering, LLC dba 5engineering

MWBE Contracted Goal (if applicable): 19.6%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of amendment No. 1 to an agreement with Fivengineering, LLC dba 5engineering, in the amount of $150,000, to provide additional engineering consulting services to augment the Flood Control District's staff for drainage report reviews (Project ID Z100-00-00-P031, Agreement No. 2023-52, Countywide, MWBE Contracted Goal: 19.6%, MWBE Current Participation: 100%).
end

Background and Discussion:
This amendment will provide for additional drainage impact analysis review support for the Watershed Management Department. The Watershed Department receives Drainage Impact Analyses (DIA) for Hydrology and Hydraulics review by Risk Mitigation Department staff. This effort helps ensure that proposed projects do not adversely impact the flood risk of others. The Risk Mitigation Department reviewers are complimented by augmented staff who may be assigned DIA reviews, especially when the reviews utilize specialized software such as XPSWMM.

Expected Impact:
This amendment will provide improved reviews of drainage impact analyses that utilize specialized software and reduce average review turnaround time as it reduces the case load for the in-house reviewers.

Alternative Options:
The alternative to ap...