Legislation Details

File #: 26-0946    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/29/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $2,648,134 for major repairs to Brays Bayou for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250370), MWBE Contracted Goal: 18.58%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 250370
Vendor/Entity Legal Name (if applicable): Environmental Allies, LLC

MWBE Contracted Goal (if applicable): 18.58%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $2,648,134 for major repairs to Brays Bayou for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250370), MWBE Contracted Goal: 18.58%.
end

Background and Discussion:
The 2025 Brays Bayou Repairs contain two sites; Site 1 is an earthen repair at Leopold and Site 2 is a concrete channel lining repair at MacGregor. Both sites will be channel restoration to restore the section to the USACE standards. This is the first major deferred maintenance project within the Federal Section of Brays Bayou under the Maintenance Matters Proposition. HCFCD received three (3) responsive bids on December 22, 2025, for this project.
The recommendation is to award the project to the lowest responsible bidder, Environmental Allies.

Expected Impact:
Site 1 is an earthen repair at a previous location, and the Bayou Greenway trail is being adjusted to successfully adjust the slope. Site 2 is a full concrete channel restoration for a failed low flow section to maintain the full conveyance capacity of the main stem of Brays Bayou for the drainage of the upstream watershed. These projects maintain our maintenanc...

Click here for full text