Legislation Details

File #: 26-0939    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/29/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval of an award on the basis of low bid to Brice Construction & Design, LLC in the amount of $1,428,556 for water line rehabilitation at Deussen Park for Precinct 1, and for the County Clerk to execute any applicable bonds to be received (250393), MWBE Contracted Goal: 20.74%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD

Secondary Department: Commissioner, Precinct 1
Secondary Department Head/Elected Official: Rodney Ellis

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable):250393
Vendor/Entity Legal Name (if applicable): Brice Construction & Design, LLC

MWBE Contracted Goal (if applicable): 20.74%
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to Brice Construction & Design, LLC in the amount of $1,428,556 for water line rehabilitation at Deussen Park for Precinct 1, and for the County Clerk to execute any applicable bonds to be received (250393), MWBE Contracted Goal: 20.74%.
end

Background and Discussion:
The existing water system at Alexander Deussen Park experiences frequent breaks and leakage. The system is currently supplied by a well located on the adjacent City of Houston property. A comprehensive evaluation of the park's existing utility systems recommended replacing the existing water mains and service lines. This project will replace and upsize the existing water main within the Deussen Park limits, including the supply line from the City of Houston water well to the terminus of the park.

Expected Impact:
The failing water system in Alexander Deussen Park can be replaced with a reliable system and minimize maintenance costs.

Alternative Options:
If the request is not approved, then the failing water system will not be replaced, and the Precinct will continue to incur high maintenance costs due to numerous water leaks of the aging water system.

County Strategic Plan Goal: 2. Connect our community with safe,...

Click here for full text