Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No 24/0383, UPIN 24208MF36J01
Vendor/Entity Legal Name (if applicable): Hayden Paving, Inc.
MWBE Contracted Goal (if applicable): 33.21%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Hayden Paving, Inc, in connection with Asphalt Package 2024 - 3, adding 150 calendar days, with an addition in the amount of $924,116.00, Job No. 24/0383-1, UPIN 24208MF36J01, Precinct 3, MWBE Contracted Goal: 33.21%, MWBE Current Participation: 100%.
end
Background and Discussion:
The project is in Harris County, Precinct 3 in City of Houston. The scope of work consists of but not limited for the rehabilitation for Asphalt roadways - Approximately 4.5 miles of roads as follows: Root Road (1.9 miles), Dowdell Road (0.35 miles) and Kuykendahl Road (2.2 miles) and full depth reconstruction of Holy Road (1.23 miles)
The Changes in contract include:
* Adding Holy Road to the project as an additional scope of work resulted in adjustments to multiple line items; both increases and decreases across various line items, yielding a net added cost of $924,116.00 and extending the contract duration by 150 calendar days
Expected Impact:
Roadway rehabilitation will provide a new road section designed for major thoroughfare traffic and include intersection improvement. Improving the roadways will ensure reliable and safe transportation routes to businesse...