Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0049, UPIN 24102MF3B301
Vendor/Entity Legal Name (if applicable): DCE Construction, Inc.
MWBE Contracted Goal (if applicable): 18.75%
MWBE Current Participation (if applicable): 18.85%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
...title
Request for approval of a change in contract with DCE Construction, Inc., in connection with final construction of Maintenance - BS2N Beamer Road - 2024, adding 15 calendar days, with an addition in the amount of $100,345.86, Job No. 25/0049-1, UPIN 24102MF3B301, Precinct 2, MWBE Contracted Goal: 18.75%, MWBE Current Participation: 18.85%.
...end
Background and Discussion:
The project includes the rehabilitation of approximately 1.7 miles of concrete pavement along Beamer Road in Harris County Precinct 2 to improve roadway conditions and safety. Work consists of full-depth concrete pavement repairs, crack sealing, replacement of traffic signal detection loops, stormwater inlet repairs, pavement striping, traffic control, and final site restoration in accordance with the approved plans and engineering standards.
PCO#1 - The original plan calls for the removal and replacement of the concrete panel from Sagerock Drive to Scarsdale Boulevard. However, during a field review, it was determined that the existing guardrail must be temporarily removed and stored to allow the contractor to complete the concrete paving work. This scope revision is necessary because the guardrail obstructs access to...