Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 22/0461, UPIN 19101MF0XV01
Vendor/Entity Legal Name (if applicable): Allgood Construction Co., Inc.
MWBE Contracted Goal (if applicable): 25%
MWBE Current Participation (if applicable): 37.13%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, with an addition in the amount of $11,224.98, Job No. 22/0461-11, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 37.13%.
end
Background and Discussion:
This project includes the construction of four 11-foot-wide concrete pavements with a 24-foot median, and an 8-foot-wide sidewalk along both sides West Gulf Bank Road from Interstate 45 Freeway to Airline Drive. It also includes drainage improvements.
Following coordination with the Harris County Fiber Department, it was determined that the existing Harris County backbone fiber splice must be relocated due to a change in the signal cabinet location. The current cable length is insufficient to reconnect the system. The proposed change includes the addition of new fiber cable to re-establish the communication link with the TranStar system. This change will add additional costs of $11,224.98, and no days.
Expected Impact:
Increase the total cost for the contract.
Alternative Options:
No action will result in substandard construction
County Strate...