Primary Department: Toll Road Authority
Primary Department Head/Elected Official: Roberto Trevi?o, P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Proposals/Bids
Project ID (if applicable): 26-6002-B; Job No. 25/0406
Vendor/Entity Legal Name (if applicable): N/A
MWBE Contracted Goal (if applicable): 19.6%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to advertise for Request for Qualifications (RFQs) for professional architectural and engineering services for design of the Washburn Tunnel Safety Enhancements - Tile Replacement project (Precinct 2; MWBE Contract Goal: 19.6%).
end
Background and Discussion:
Washburn Tunnel completed construction in 1950. Facility condition assessments are routinely performed on the tunnel to assess its overall condition and the condition of its elements. As part of the assessments, it has been determined that the tile adhesion has been compromised and requires replacement. This request for advertisement for professional architectural and engineering services qualifications will allow for design for the removal and replacement of the tile and tile adhesion. This will also allow for inspection of the tunnel liner currently covered by the tile. With Commissioners Court approval, the solicitation for qualifications will be advertised for a minimum of three weeks.
Expected Impact:
Identify qualified firms for the Project.
Alternative Options:
No other recommended solutions for this identified need.
County Strategic Plan Goal: 1. Make Harris County safer and more just.
County Strategic Plan Objective: H: Improve the condition an...
Click here for full text