Legislation Details

File #: 26-0608    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/13/2026 In control: Commissioners Court
On agenda: 1/29/2026 Final action: 1/29/2026
Title: Request for approval to execute an agreement with Alliance Geotechnical Group, Inc., in the amount of $56,851.00 for Professional Engineering Services regarding Construction Materials Testing and related Service for Sidewalk - Cypress Station Area - 2023, UPIN 24101MF35S01, Precinct 1, MWBE Contracted Goal: 100%.
Attachments: 1. 26-0608-24101MF35S01 -Sidewalk - Cypress Station Area - 2023-Alliance Geotechnical-1.29
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

Secondary Department: Commissioner, Precinct 1
Secondary Department Head/Elected Official: Rodney Ellis, Commissioner

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 24101MF35S01
Vendor/Entity Legal Name (if applicable): Alliance Geotechnical Group

MWBE Contracted Goal (if applicable): 100%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Alliance Geotechnical Group, Inc., in the amount of $56,851.00 for Professional Engineering Services regarding Construction Materials Testing and related Service for Sidewalk - Cypress Station Area - 2023, UPIN 24101MF35S01, Precinct 1, MWBE Contracted Goal: 100%.
end

Background and Discussion:

This project is located in the North Houston area, in proximity of the I-45 and Farm to Market 1960 Rd W Intersection. This project is proposing sidewalk on both sides of the existing roadway along Cypress Station Drive from Hollow Tree Lane to Wells Fargo Drive (Approx. 9,500 feet or 1.8 miles - both sides of the road) and Peakwood Drive from Cali Drive to West of Satinwood Drive (Approx. 1,600 feet or 0.3 miles - both sides of road) and Butterfield Rd from Hafer Rd to Cypress Station Dr (Approx. 791 feet or 0.15 miles - both sides or road) and Lantern Bend Dr from Cypress Station Dr to Westfield Pl Drive (Approx. 1,655 feet or 0.31 miles - both sides of road). The scope and proposed improvements include proposed sidewalk, driveway reconstruction as necessary, pavement striping and re-striping, and ADA compliant curb ramps.
...

Click here for full text