Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer
Secondary Department: Commissioner, Precinct 1
Secondary Department Head/Elected Official: Rodney Ellis, Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 24101MF35S01
Vendor/Entity Legal Name (if applicable): Alliance Geotechnical Group
MWBE Contracted Goal (if applicable): 100%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Alliance Geotechnical Group, Inc., in the amount of $56,851.00 for Professional Engineering Services regarding Construction Materials Testing and related Service for Sidewalk - Cypress Station Area - 2023, UPIN 24101MF35S01, Precinct 1, MWBE Contracted Goal: 100%.
end
Background and Discussion:
This project is located in the North Houston area, in proximity of the I-45 and Farm to Market 1960 Rd W Intersection. This project is proposing sidewalk on both sides of the existing roadway along Cypress Station Drive from Hollow Tree Lane to Wells Fargo Drive (Approx. 9,500 feet or 1.8 miles - both sides of the road) and Peakwood Drive from Cali Drive to West of Satinwood Drive (Approx. 1,600 feet or 0.3 miles - both sides of road) and Butterfield Rd from Hafer Rd to Cypress Station Dr (Approx. 791 feet or 0.15 miles - both sides or road) and Lantern Bend Dr from Cypress Station Dr to Westfield Pl Drive (Approx. 1,655 feet or 0.31 miles - both sides of road). The scope and proposed improvements include proposed sidewalk, driveway reconstruction as necessary, pavement striping and re-striping, and ADA compliant curb ramps.
...
Click here for full text