Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 250366
Vendor/Entity Legal Name (if applicable): MB Western Construction Co.
MWBE Contracted Goal (if applicable): 25.12%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to MB Western Construction Co. in the amount of $1,422,072 for sediment removal in Addicks and Barker Reservoir Watersheds (Package 1) for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250366), MWBE Contracted Goal: 25.12%.
end
Background and Discussion:
Project ID Z100-00-00-X331 is located within the Addicks and Barker Reservoir watersheds in Harris County, spanning Precincts 3 and 4. The project limits include multiple stormwater channels totaling approximately 10,000 linear feet that provide drainage for several subdivisions and convey flows to downstream channels out falling to T100-00-00 and U100-00-00 within the Addicks and Barker Reservoirs. Inspections conducted following Hurricane Harvey in 2017 identified significant sediment deposition within these channels as a result of the declared disaster. To ensure continued and effective stormwater conveyance from surrounding neighborhoods, this project will restore the affected channels to their pre-storm form and hydraulic capacity, returning them to the condition that existed prior to August 2017.
Expected Impact:
The intent of this project is to ensure continued and effe...