Legislation Details

File #: 26-0271    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 12/22/2025 In control: Commissioners Court
On agenda: 1/8/2026 Final action: 1/8/2026
Title: Request for approval to execute a Service Outlet Location (SOL) statement with CenterPoint Energy Houston Electric, LLC for installation of three (3) 50 kVA transformers (277/480V) to power the lift station, located at 2201 1/2 Connorvale for the Connorvale Development project, UPIN 21289MF1Z501, Precinct 2.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 2
Secondary Department Head/Elected Official: Adrian Garcia

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 21289MF1Z501
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location (SOL) statement with CenterPoint Energy Houston Electric, LLC for installation of three (3) 50 kVA transformers (277/480V) to power the lift station, located at 2201 1/2 Connorvale for the Connorvale Development project, UPIN 21289MF1Z501, Precinct 2.
end

Background and Discussion:
The Connorvale Development is an infrastructure project designed to support single-family affordable housing. The scope includes roadway and sidewalk construction; installation of sanitary sewer and storm drainage systems; pavement improvements; and construction of a lift station and detention ponds to serve East Aldine Estates in Precinct 2. According to CenterPoint Energy, this location represents Harris County's first point of service; therefore, no costs are owed by the County for this SOL. CenterPoint Energy will provide a service drop to Harris County.

Expected Impact:
Approval of the Service Outlet Location (SOL) statement will allow CenterPoint Energy to install three (3) 50 kVA transformers (277/480V) to power the lift station, located at 2201 1/2 Connorvale. This electrical service is essential to support infrastructure serving E...

Click here for full text