Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No 24/0215, UPIN 22102MF2D501
Vendor/Entity Legal Name (if applicable): McCory Engineering
MWBE Contracted Goal (if applicable): 25%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with McCory Engineering, in connection with Trail - Pinckney Trail - (TIRZ 21) 2021, adding 120 calendar days, with an addition in the amount of $10,616.00, Job No. 24/0215-2, UPIN 22102MF2D501, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 100%.
end
Background and Discussion:
The project is in Harris County, Precinct 2 in City of Houston. The project consists of constructing approximately 750 feet a 10-ft-wide hike and bike trail from the White Oak Bayou Greenway Trail to the intersection of Fletcher Street and Pinckney Street. The project will also include a proposed 200-ft long retaining wall with a concrete swale, approximately 900 LF of varying size storm sewer along with inlets and manholes, a headwall, grass-lined swales, bollards, permanent street and trail signs, handrails, waterline and sanitary line adjustments, benches, trash receptacles, and pavement markings accompanying the trail.
The Changes in contract include:
* A restocking fee for the 24-inch RCP is needed due to the design revision, as the material previously delivered to the field is no longer needed for Line Item #31. This change results in an additional cost ...
Click here for full text