Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0420, UPIN 14104MF08X01
Vendor/Entity Legal Name (if applicable): MC2 Civil, LLC
MWBE Contracted Goal (if applicable): 27%
MWBE Current Participation (if applicable): 34.78%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with MC2 Civil, LLC, in connection with Treaschwig Rd A (Phase 1) - from 1,000' west of Aldine Westfield Rd to west of Cypress Creek - 2014, with an addition in the amount of $1.00, Job No. 23/0420-3, UPIN 14104MF08X01, Precinct 3, MWBE Contracted Goal: 27%, MWBE Current Participation: 34.78%.
end
Background and Discussion:
The project consists of construction of Treaschwig Road Segment A Phase 1 project consists of reconstruction and widening of Treaschwig Road from a 2-lane asphalt to a 4-lane concrete roadway from 1000' west of Aldine Westfield to west of Cypress Creek. Additionally, extend intersection improvements at Aldine Westfield by 500' North and South of Treaschwig Road. Project will construct a wet bottom detention pond adjacent to Cypress Creek.
PCO #16 (RFI #44)
PCO #16 (RFI #44) includes revisions to the project scope related to the permanent relocation of the existing 12-inch waterline with 24-inch steel encasement, located east of the Treaschwig Road and Aldine Westfield Road intersection.
Based on revised plan sheets prepared by the Engineer of Record, the total cost for this work is $207,335.00, as reviewed and approved by Vogler & S...