Type of Request: Contract - Award
Project ID (if applicable): 250353
Vendor/Entity Legal Name (if applicable): Environmental Allies, LLC
MWBE Contracted Goal (if applicable): 27.26%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $2,539,099 for construction of the Brookglen Stormwater Detention Basin for the Flood Control District (CDBG-DR/GLO), and for the County Clerk to execute any applicable bonds to be received (250353), MWBE Contracted Goal: 27.26%.
end
Background and Discussion:
The Brookglen Stormwater Detention Basin (SWDB) (HCFCD Unit B512-00-00-E002) project site consists of excavating the three compartments of a stormwater detention basin bounded by Somerton Drive to the west, Ashwyne Lane to the north, CenterPoint Energy property with high voltage transmission facilities to the east, and a transmission line property to the south, within the City of La Porte, Texas. The scope of work includes the off-site disposal of approximately 45,157 cubic yards of excavated material to facilitate the construction of a dry-bottom stormwater detention basin. The basin will be divided into three compartments to mitigate potential conflicts with an existing 30-inch natural gas transmission line. Additionally, the project includes the demolition and removal of existing pavement as part of the decommissioning of the previously abandoned Gladwyne Lane.
The proposed detent...