Title: Request for approval of an amendment to an agreement with BGE, Inc. in the amount of $149,018.50 for professional engineering and related services in connection with improvements to Hufsmith-Kohrville Rd 2, UPIN 15104M23NP02, Precinct 3.
Sponsors: Mony Hossain
Attachments: 1. ( 25-7891)-CIC-UPIN-15104M23NP02- BGE Inc- Hufsmith-Kohrville Rd 2 -Amendment-Revised12-11-2025.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 15104M23NP02
Vendor/Entity Legal Name (if applicable): BGE, Inc.

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with BGE, Inc. in the amount of $149,018.50 for professional engineering and related services in connection with improvements to Hufsmith-Kohrville Rd 2, UPIN 15104M23NP02, Precinct 3.
end

Background and Discussion:
The County initially engaged BGE, Inc. in 2014 for the study and design of the project, and now seeks their continued support during construction, including revising plans, redesigning the lift station pumps, reconfiguring the Ezekiel Rd. and Grand Ashford intersections along Hufsmith-Kohrville Rd., modifying the transition at the north end of the project, and conducting a geotechnical investigation at the south pond to address underground seepage; this contract amendment compensates the consultant for these additional design and drawing changes.



Expected Impact:
This action will allow the engineer of record to continue supporting the project through construction




Alternative Options:
If no action is taken, the engineer of record will not be accessible for support through the construction of the project.


County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.