Legislation Details

File #: 25-7646    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 11/24/2025 In control: Commissioners Court
On agenda: 12/11/2025 Final action: 12/11/2025
Title: Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $992,966 for rehabilitation of channels within Addicks Reservoir for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250303), MWBE Contracted Goal: 24.88%.
Attachments: 1. 25-7646 Award Job No. 250303 Environmental Allies, Inc..pdf
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 250303
Vendor/Entity Legal Name (if applicable): Environmental Allies, LLC

MWBE Contracted Goal (if applicable): 24.88%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to Environmental Allies, LLC in the amount of $992,966 for rehabilitation of channels within Addicks Reservoir for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (250303), MWBE Contracted Goal: 24.88%.
end

Background and Discussion:
The Addicks Reservoir located in Precinct 4 receives stormwater flow from multiple channels. Over time these channels have received significant silt buildup and, in some cases, erosion of the channel slopes. In order to assure that flows from the surrounding neighborhoods can enter the reservoir, this project will rehabilitate 3 channels, U100-00-00, U202-00-00 and U107-00-00. Work will involve silt removal, bank stabilization and rip rap erosion protection. This infrastructure maintenance work will be executed as a result of the passage of the "Maintenance Matters" Proposition in November 2024.

Expected Impact:
The intent of this contract is to restore stormwater flows into the reservoir at or near to the original design capacity. This will benefit the neighborhoods upstream of the reservoir as stormwater is able to flow downstream and thereby reducing the potential for the neighborhood flooding.

A...

Click here for full text