Title: Request for approval to execute an agreement with Concept Engineers Inc. in the amount of $342,620 for Professional Engineering Services in connection with Maintenance - Clear Lake Park Bulkhead Replacement - Precinct 2 - 2023, UPIN 24102MF3BG01, Precinct 2, MWBE Contracted Goal: 19.6%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 24102MF3BG01
Vendor/Entity Legal Name (if applicable): Concept Engineers, Inc

MWBE Contracted Goal (if applicable): 19.6%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Concept Engineers Inc. in the amount of $342,620 for Professional Engineering Services in connection with Maintenance - Clear Lake Park Bulkhead Replacement - Precinct 2 - 2023, UPIN 24102MF3BG01, Precinct 2, MWBE Contracted Goal: 19.6%.
end

Background and Discussion:
The request will allow Harris County to initiate the study, design and bid phases with Concept Engineers Inc to provide professional engineering services to develop the engineering plans for the necessary maintenance / replacement of the damaged bulkhead at Lake Clear Park. The existing Bulkhead is in urgent need of repairs long overdue because of extensive damage caused by the repeated impacts of frequent storms and severe weather conditions. In addition, the shore front adjacent to the two boat ramps has been severely eroded over the years and is slowly extending further into the parking lot as the water from the waves washes away the soil supporting the parking lot above it. After the necessary repairs hand rails are required at the boat ramps for safety purposes .

Expected Impact:
The construction project will result in the urgently required maintenance work to replace, repair, support and stabilize...