Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Utility Agreement
Project ID (if applicable): 22103N306630001
Vendor/Entity Legal Name (if applicable): Grant Road Public Utility District
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
...title
Request for approval to execute an agreement with Grant Road Public Utility District in the amount of $13,800.00, to relocate a water line in connection with North Eldridge Parkway - from South of Pine Drive to South of Lakewood Meadow Drive - 2021, UPIN 22103N306630001, Precinct 3.
end
Background and Discussion:
North Eldridge Parkway - from South of Pine Drive of Lakewood Meadow Drive project involves the construction of a 2 Lane boulevard to a 4-lane concrete boulevard expansion with curb and gutter and storm drain. This Utility Construction Services Agreement is required to facilitate the relocation of a Water Line currently in conflict with the proposed storm sewer along North Eldridge Parkway, allowing construction to proceed without obstruction.
Expected Impact:
Approval of this agreement will allow the water line in conflict with the proposed storm sewer. The relocation is necessary for Harris County to proceed with construction of roadway widening.
Alternative Options:
Due to the nature of the conflict with the water line, there is no alternative solution. If the water line remains in its current location, it will not allow the construction of the storm sewer.
County Strategic Plan Goal: ...