Legislation Details

File #: 25-7153    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 10/29/2025 In control: Commissioners Court
On agenda: 11/13/2025 Final action: 11/13/2025
Title: Request for approval to execute a Utility Agreement with ExxonMobil Pipeline Company LLC in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements - 2018, UPIN 19102MF15W01, Precinct 2.
Attachments: 1. 25-7153-UA-UPIN 19102MF15W01-Cedar Bayou Park-EXXON-P2
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): UPIN 19102MF15W01
Vendor/Entity Legal Name (if applicable): ExxonMobil Pipeline Company LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Utility Agreement with ExxonMobil Pipeline Company LLC in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements - 2018, UPIN 19102MF15W01, Precinct 2.
end

Background and Discussion:
The Cedar Bayou Park project is located in east Harris County in Precinct 2. The scope of work for this utility agreement includes Harris County's installation of three 42" steel drainage boxes within EXXON easement. This agreement will allow Harris County to perform the installation work and to be active within the easement.

Expected Impact:
This project generally seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This utility agreement specifically will allow Harris County to install three 42" steel drainage boxes to direct flow from the subdivision into the detention basin. No impact to project schedule or staffing anticipated.

Alternative Options:
Alternative options would include redesigning the project to avoid the easement or abandonment of the project.




County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and wel...

Click here for full text