Legislation Details

File #: 25-7151    Version: 1 Name:
Type: Report Status: Passed
File created: 10/29/2025 In control: Commissioners Court
On agenda: 11/13/2025 Final action: 11/13/2025
Title: Request for approval of a Study Report prepared by Westwood Professional Services Inc., for Humble Road Place and Parkland Estates Subdivisions Drainage Improvements - 2018, UPIN 21090MF22H01, Precincts 1 and 2.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County


Secondary Department: Choose an item.
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable):21090MF22H01
Vendor/Entity Legal Name (if applicable): Westwood Professional Services Inc

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by Westwood Professional Services Inc., for Humble Road Place and Parkland Estates Subdivisions Drainage Improvements - 2018, UPIN 21090MF22H01, Precincts 1 and 2.
end

Background and Discussion:
This project is located in the North-East Houston area, in proximity of US-59 and Beltway 8
Interchange. Humble Road Place subdivision is located within the Precinct 1 boundaries, whereas Parkland
Estates lays within Precinct 2 limits and both subdivisions are part of the Greens Bayou Watershed. The
northern part drains into HCFCD Unit No. P133-00-00 and the southern part into HCFCD Unit No. P100-00-00.
Over 250 residential structures have flooded during previous storm events, including Hurricane Harvey. The
scope and proposed improvements include roadside ditch regrading, driveway culvert upgrades, underground
storm sewer network, and detention ponds.
Expected Impact:
In implementing the proposed drainage improvements, this project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to at least 100 residential structures within these two communities. This will reduce the financial, physical, and emotional burden flood ...

Click here for full text