Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: Not applicable
Regular or Supplemental RCA: Regular RCA
Type of Request: Public Necessity
Project ID (if applicable): 15104MF0CD01
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder
MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, directing the Harris County Real Property Division to acquire, one (1) fee simple and thirteen (13) temporary construction easement tracts for the public project known as Cypress North Houston Rd - from Perry Rd to Jones Rd - 2014, for the purpose of roadway construction, UPIN 15104MF0CD01, Precinct 3.
end
Background and Discussion:
The project involves the design and construction of the proposed expansion of Cypress North Houston from Jones Rd to Perry Rd to result in a four-lane concrete boulevard. The project includes storm drain and sidewalks and detention basin mitigation and traffic signals at Perry Road, Autumn Mill Drive, and Misty Moss Lane.
Expected Impact:
The project will address current and future traffic volumes, reduce delays, and provide safe mobility for residents, pedestrians, and drivers.
Alternative Options:
If no action is taken, there will be delays in area mobility improvement.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.