Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 25103MF3MV01; Job No. 25/0243
Vendor/Entity Legal Name (if applicable): Raba-Kistner, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: 0% - Non-Divisible
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Raba-Kistner Inc. in the amount of $197,337.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Roadway Maintenance - Asphalt Package - 1 - 2025, UPIN 25103MF3MV01, Precinct 3, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
end
Background and Discussion:
Precinct 3 is requesting the Office of the County Engineer to enter into an agreement for professional engineering services to provide Construction Phase services for the subject maintenance project which consists of mill & overlay with base repairs on Spring Cypress Road and Louetta Road within Precinct 3. The total length of the project is 2.7 miles of roadway, covering the subject roads. Spring Cypress Road is a 4-lane (with cont. turn lane) asphalt major thoroughfare within 120-ft of ROW with 11-ft lanes, 1 concrete channel crossing over Spring Gully (VH-SPC16006) and open ditches. The corridor is on the HC road log. Louetta Road is a 4-lane (with cont. turn lane) asphalt major thoroughfare within 100-ft of ROW, with 11-ft lanes, 1 concrete channel crossing over Dry Gully (VH-LOU11005) and open ditches.
Expected Impact:
This agreement will ...