Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 22/0461, UPIN 19101MF0XV01
Vendor/Entity Legal Name (if applicable): Allgood Construction Co., Inc.
MWBE Contracted Goal (if applicable): 25%
MWBE Current Participation (if applicable): 38.76%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Allgood Construction Co. Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, with an addition in the amount of $66,537.22, Job No. 22/0461-10, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 38.76%.
end
Background and Discussion:
This project includes the construction of four 11-foot-wide concrete pavements with a 24-foot median, and an 8-foot-wide sidewalk along both sides West Gulf Bank Road from Interstate 45 Freeway to Airline Drive. It also includes drainage improvements.
This change includes the following:
- A review of conduit sizing at the proposed traffic signal intersections (Sweetwater, Cobbleshire, and Airline) was conducted based on the number of signal cables listed in the Electrical Chart. The Engineer of Record determined that Sweetwater Run 24 does not have sufficient capacity for the required cables. It is recommended to revise this run from a 3-inch conduit to a 4-inch conduit to accommodate the cable volume. No changes are necessary for Cobbleshire or Airline, as existing conduit sizes are adequate. This change adds an additional $325.87 and no additional da...