Legislation Details

File #: 25-6291    Version: 1 Name:
Type: Report Status: Passed
File created: 10/1/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval of a Study Report prepared by HDR Engineering, Inc., for Market Street from South Sheldon to Lakeside Drive, UPIN 23102MF2UP01, Precinct 2.
Primary Department: Choose an item.
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

Secondary Department: Choose an item.
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): 23102MF2UP01
Vendor/Entity Legal Name (if applicable): HDR Engineering, Inc

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by HDR Engineering, Inc., for Market Street from South Sheldon to Lakeside Drive, UPIN 23102MF2UP01, Precinct 2.
end

Background and Discussion:
The project in East Harris County, consists of approximately 7,240 Linear lengths of roadway. HDR Engineering Inc was awarded a contract to provide roadway reconstruction and related improvements along Market Street from South Sheldon to Lakeside Drive. The goal is to study the existing conditions of Market Street and provide the best reconstruction options. Based on that agreement, HDR Engineering submitted the final study report on September 23, 2025.


Expected Impact:
Corridor Study to Improve Roadway


Alternative Options:
If no action is taken, the project may experience delays in improving mobility in the area.



County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county's transportation network in alignment with the County's Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County's commitment to Vision...

Click here for full text