Legislation Details

File #: 25-6233    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 10/1/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Transmittal by the Flood Control District of a preliminary engineering report by Agha Engineering, LLC dated June 30, 2025, and titled Keegans Stormwater Detention Basin (Brays Bayou Watershed, Bond ID F-07, Project ID D518-03-00-E001, Precinct 4).
Attachments: 1. D518-03-00-E001 PBM (20250918).pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): D518-03-00-E001
Vendor/Entity Legal Name (if applicable): Agha Engineering, LLC

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report by Agha Engineering, LLC dated June 30, 2025, and titled Keegans Stormwater Detention Basin (Brays Bayou Watershed, Bond ID F-07, Project ID D518-03-00-E001, Precinct 4).
end

Background and Discussion:
The purpose of this transmittal is to request the acceptance of the Preliminary Engineering Report (PER) titled Keegans Stormwater Detention Basin to continue with the full implementation of the project. This project is generally located along Keegans Bayou, near the confluence of D118-14-00, between Synott Road and S. Dairy Ashford in the City of Houston. The purpose of this project is to reduce flood risk to the Keegans Bayou watershed by reducing water surface elevations (WSELs) along Keegans Bayou near the D118-14-00 confluence. After evaluating three alternatives, alternative 1 was selected as the recommended alternative. It consists of three basin compartments providing 437 ac-ft of stormwater detention storage, as well as channel improvements along D118-14-00, and will be implemented in three phases. This project scores in the first quartile of the 2022 prioritization framework.

Expected Impact:
The project will provide 437 ac-ft of stormwater sto...