Legislation Details

File #: 25-6225    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/1/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval of change in contract No. 2 with A Morfin Trucking, LLC, for the Yale Stormwater Detention Basin, resulting in an addition of $25,910.13 to the contract amount (White Oak Bayou Watershed, Bond ID F-09, Project ID E501-03-00-E001, Job No. 24/0350, Precinct 2, MWBE Contracted Goal: 13.35%, MWBE Current Participation: 48.21%).
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): E501-03-00-E001
Vendor/Entity Legal Name (if applicable): A Morfin Trucking, LLC

MWBE Contracted Goal (if applicable): 13.35%
MWBE Current Participation (if applicable): 48.21%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 2 with A Morfin Trucking, LLC, for the Yale Stormwater Detention Basin, resulting in an addition of $25,910.13 to the contract amount (White Oak Bayou Watershed, Bond ID F-09, Project ID E501-03-00-E001, Job No. 24/0350, Precinct 2, MWBE Contracted Goal: 13.35%, MWBE Current Participation: 48.21%).
end

Background and Discussion:
This change in contract is needed to complete the construction scope for this project. The Yale Stormwater Detention Basin project includes a wet bottom detention basin with an inflow side weir and flap gate outfall pipe, adjacent to E101-00-00 (Little White Oak Bayou). The Project is located southeast of the intersection at W. Tidwell Road and Yale Street, in the White Oak Bayou Watershed. The purpose of this contract change is to reconcile estimated quantities with actual project requirements. The change increases the underestimated quantities for Remove and Dispose of Concrete Rubble and Structures (02120-03), All Pipes (02120-04), and Driveways and Sidewalks (02120-26). Additionally, the quantity of Concrete Box Inlets (02632-50), which are no longer required for construction, is being deducted to offset the associated cost.

Expected Impac...