Title: Request for approval to execute an agreement with Atser, LP in the amount of $546,821.00 for professional engineering services regarding Construction Materials Testing and related services for Barwood Subdivision Drainage Improvements - 2018, UPIN 19103MF12H01, Precinct 3, MWBE Contracted Goal: 100%.
Attachments: 1. 25-6181-Award-19103MF12H01-Barwood Subdivision-Atser, LP-P3-10.16.25
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 19103MF12H01; Job No. 25/0227
Vendor/Entity Legal Name (if applicable): Atser, LP

MWBE Contracted Goal (if applicable): 100%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Atser, LP in the amount of $546,821.00 for professional engineering services regarding Construction Materials Testing and related services for Barwood Subdivision Drainage Improvements - 2018, UPIN 19103MF12H01, Precinct 3, MWBE Contracted Goal: 100%.
end

Background and Discussion:

The project is located in northwest Harris County in the White Oak Bayou watershed. Barwood consists of a curb and gutter with storm sewer drainage system that drains into HCFCD channels E132-00-00 and E133-00-00. The proposed improvements increase the size and capacity of the storm sewer system within the neighborhood with mitigation provided by the E132-00-00-00 Mitigation Project along the E132-00-00 channel and internal mitigation for improvements draining to E133-00-00. The scope and proposed improvements include storm sewer improvements, road reconstruction, replacement of driveways and driveway culverts. Improvements will comply with Harris County standards.

Expected Impact:

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material's compliance with Harris County En...