Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, CNV-SP, County Engineer
Secondary Department: Commissioner, Precinct 1
Secondary Department Head/Elected Official: Commissioner Rodney Ellis
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 22101MF26701
Vendor/Entity Legal Name (if applicable): CE Barker Ltd.
MWBE Contracted Goal (if applicable): 21%
MWBE Current Participation (if applicable): 20.23%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): n/a
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with CE Barker Ltd., in connection with 5400 Lockwood - Hutcheson Park - Public Restrooms - 2021, adding 110 calendar days, with an addition in the amount of $37,983.00, UPIN 22101MF26701, Precinct 1, MWBE Contracted Goal: 21%, MWBE Current Participation: 20.23%.
end
Background and Discussion:
Hutcheson Park is located in the 100-year floodplain of the Hunting Bayou watershed along HCFCD channel
H100-00-00. The existing restroom building at Hutcheson Park is a prefabricated wood-framed 2-user facility
constructed in or about 1994 and is in poor condition. Proposed improvements include a new floodproofed 4-user restroom building constructed from concrete masonry unit (CMU) block with a new foundation and
related utility and detention improvements. Change Order includes:
1) Add rebar to pilot channel where not shown on plans. Rebar installed per response to RFI-007.
2) Add scope for interior ceilings, paints. Add soffit and paint on exterior and added sod on outside of building. Deducted value for changing roofing material.
Expected Impact:
The park includes a playground, fitness center, loop trail, and tennis court, which are regula...
Click here for full text