Legislation Details

File #: 25-6175    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/30/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval of an amendment to an agreement with PGAL, Inc., for Construction Phase Services in the amount of $ 16,883.00 for the Recovery and Resiliency Division (RRD) Barrett Station (Phase 2 - Barrett Settlement & St. Charles Place) Subdivision Drainage Improvements - 2018, UPIN 19102MF14Q01, Precinct 3, MWBE Contracted Goal: 31%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): UPIN 19102MF14Q01
Vendor/Entity Legal Name (if applicable): PGAL, Inc.

MWBE Contracted Goal (if applicable): 31%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with PGAL, Inc., for Construction Phase Services in the amount of $ 16,883.00 for the Recovery and Resiliency Division (RRD) Barrett Station (Phase 2 - Barrett Settlement & St. Charles Place) Subdivision Drainage Improvements - 2018, UPIN 19102MF14Q01, Precinct 3, MWBE Contracted Goal: 31%.
end

Background and Discussion:
Barrett Station (Phase 2 - Barrett Settlement & St. Charles Place) Subdivision Drainage Improvements is located in northeast Harris County in the San Jacinto watershed with a small portion in the Cedar Bayou watershed. It is to the south of Barrett Road, east of Crosby-Lynchburg Road, and north of Cottontail Drive. The existing drainage system is roadside ditches. The proposed improvements are to regrade roadside ditches, upsize culverts to increase capacity, and to construct a detention pond for mitigation.

The additional funds will cover the construction phase services agreement to allow for construction oversight of the project.

Expected Impact:
This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. Engineering support during the construc...