Title: Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, with an addition in the amount of $41,383.48, Job No. 22/0461-9, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 38.76%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 22/0461, UPIN 19101MF0XV01
Vendor/Entity Legal Name (if applicable): Allgood Construction Co., Inc.

MWBE Contracted Goal (if applicable): 25%
MWBE Current Participation (if applicable): 38.76%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, with an addition in the amount of $41,383.48, Job No. 22/0461-9, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 38.76%.
end

Background and Discussion:
This project includes the construction of four 11-foot-wide concrete pavements with a 24-foot median, and an 8-foot-wide sidewalk along both sides West Gulf Bank Road from Interstate 45 Freeway to Airline Drive. It also includes drainage improvements.

This change includes the following:
- The address 9004 North Fwy, Houston, TX 77092 is part of the overall project. The riser at this location was not relocated during the initial CenterPoint pole relocation, requiring new wire installation from the relocated riser to the building. When CenterPoint attempted to install the meter, the building was red-tagged due to the existing meter being out of compliance with the new wire. A generator was required, and the meter was replaced to bring the system into compliance. This change adds an additional $22,618.70 and no additional days.
- The conduit and cable ch...