Legislation Details

File #: 25-5962    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 9/8/2025 In control: Commissioners Court
On agenda: 9/18/2025 Final action: 9/18/2025
Title: Request for approval of an award on the basis of low bid to MC2 Civil, LLC in the amount of $3,194,500 for construction of the Downtown Tunnel Flood Mitigation Lift Station for Precinct 1, and for the County Clerk to execute any applicable bonds to be received (250131), MWBE Contracted Goal: 9.12%.
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD

Secondary Department: Commissioner, Precinct 1
Secondary Department Head/Elected Official: Rodney Ellis

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): 250131
Vendor/Entity Legal Name (if applicable): MC2 Civil, LLC

MWBE Contracted Goal (if applicable): 9.12%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to MC2 Civil, LLC in the amount of $3,194,500 for construction of the Downtown Tunnel Flood Mitigation Lift Station for Precinct 1, and for the County Clerk to execute any applicable bonds to be received (250131), MWBE Contracted Goal: 9.12%.
end

Background and Discussion:
The Harris County Downtown Tunnel System connects and provides access to 15 County buildings in Downtown Houston. This project aims to mitigate flooding by installing a large lift station with several sump pumps, powered by an emergency generator on the most vulnerable part of the tunnels, covering the area from the Criminal Justice Center to the Juvenile Justice Center and Civil Court house, to ensure proper flood water removal during extreme weather events.

Expected Impact:
Awarding this project to the selected vendor will permit this project to transition to the construction phase, thus implementing the flood mitigation plan for the Downtown Tunnel System. The large lift station will ensure proper flood water removal during extreme weather events.

Alternative Options:
Not to award this project, thus keeping the flooding problem unresolved, or award to a higher bidder with a consequential increase in cost.

County Strategic...