Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 22/0348, UPIN 19101MF17A01
Vendor/Entity Legal Name (if applicable): E.P. Brady, Ltd.
MWBE Contracted Goal (if applicable): 20%
MWBE Current Participation (if applicable): 29.46%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with E.P. Brady, Ltd., in connection with final construction of Kingslake Forest Subdivision Drainage Improvements, with a deduction in the amount of $44,350.75, Job No. 22/0348-02, Grant Fund, UPIN 19101MF17A01, Precinct 1, MWBE Contracted Goal: 20%, MWBE Current Participation: 29.46%.
end
Background and Discussion:
Kingslake Forest Subdivision located in Northeast Harris County, Texas, Precinct 1. Under existing conditions, the Kingslake Forest Subdivision has experienced flood damage during extreme rainfall events. The project will include storm sewer improvements along multiple streets in the neighborhood. The proposed drainage improvements will consist of removal and replacement of existing storm sewers, as well as replacement of the inlets. A detention basin will also be added to the southeastern portion of the neighborhood, to mitigate for the impacts to Greens Bayou tributary P127-00-00 from the improvements. This detention basin will be dry bottom basin, with a perimeter concrete trail. The basin may include recreational features such as mature trees, signage, trash receptables, and benches.
The change in contract includes the following:
The l...
Click here for full text