Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job 24/0111, UPIN 23102MF2QS01
Vendor/Entity Legal Name (if applicable): Skilled Construction Subs Unlimited
MWBE Contracted Goal (if applicable): 24%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Skilled Construction Subs Unlimited in connection with final construction of Sidewalk - Uvalde Road from Wallisville Road to Holly Park Drive - 2022, with a deduction in the amount of $95,601.46, Job 24/0111-1, UPIN 23102MF2QS01, Precinct 2, MWBE Contracted Goal: 24%.
end
Background and Discussion:
The project consists of the construction of approximately 10,044 LF of 6-foot-wide sidewalks on both sides of Uvalde Road from Wallisville Road to Holly Park Drive Sidewalk Improvements include construction of sidewalks, ADA ramps, and driveways, replace broken curbs, damaged slope paving, and driveways.
The budget variances across the project resulted from a mix of effective resource management, value engineering, and strategic procurement that led to cost savings in some areas, while necessary scope adjustments, unforeseen site conditions, and regulatory compliance requirements caused certain items to exceed their budgeted amounts. This change order will deduct -$95,601.46.
Expected Impact:
Deduct the total cost for the contract
Alternative Options:
No action will result in substandard construction.
County Strategic Plan Goal: 2. Conn...