Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0264, UPIN 20101MF1F101
Vendor/Entity Legal Name (if applicable): Spawglass Construction Corp.
MWBE Contracted Goal (if applicable): 14.68%
MWBE Current Participation (if applicable): 11.45%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Spawglass Construction Corp. in connection with Challenger 7 Park - Boardwalk Renovation - 2020, with an addition in the amount of $44,462.56, Job No. 24/0264-2, UPIN 20101MF1F101, Precinct 2, MWBE Contracted Goal: 14.68%, MWBE Current Participation: 11.45%.
end
Background and Discussion:
Challenger 7 Park - Boardwalk Renovation project includes work in three distinct areas. The existing boardwalk area will include removal of the existing boardwalk and replacement with a new structure. Learning components including an immersive classroom, outdoor classroom, and areas for future signage will be identified. The project also contains the addition of a trailhead with bike parking. The area near the boat ramp will be repurposed to include additional walking trails, seating area, floating kayak launch, and planting. The Changes in contract include:
* An additional removal of 1 tree is needed for line Item # 11 with an additional cost of $1,088.15, a reduction in quantity by 8 SY of 4.5" thick sidewalk for line item # 20 with a saving in cost of $254.00, the wrecking and reworking the forms for the sidewalk as Lump Sum (new line item # 68...
Click here for full text