Title: Request for approval of a change in contract with DVL Enterprises, LLC in connection with Mound Road Extension from Greenhouse Road along Spring Drive to Cypress Drive - Segment 2, with an addition in the amount of $3,315.60, Job No. 24/0265-2, UPIN 24103MF3C501, Precinct 3, MWBE Contracted Goal: 27.62%, MWBE Current Participation: 26.08%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No. 24/0265, UPIN 24103MF3C501
Vendor/Entity Legal Name (if applicable): DVL Enterprises, LLC

MWBE Contracted Goal (if applicable): 27.62%
MWBE Current Participation (if applicable): 26.08%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with DVL Enterprises, LLC in connection with Mound Road Extension from Greenhouse Road along Spring Drive to Cypress Drive - Segment 2, with an addition in the amount of $3,315.60, Job No. 24/0265-2, UPIN 24103MF3C501, Precinct 3, MWBE Contracted Goal: 27.62%, MWBE Current Participation: 26.08%.
end

Background and Discussion:
The project section of Mound Road 2 is a 4-lane, median-divided concrete roadway extended from Greenhouse Road and transitioning to 2-lane asphalt and gravel roadways terminating at Cypress Drive Mound Road Extension project to be divided into two segments to provide accessibility to adjacent developments and finalize the outfall design servicing the project. This change in contract will result in significant cost savings by installing HDPE (High-Density Polyethylene) in lieu of RCP (reinforced Concrete Pipe). Unlike RCP, which requires a headwall at the outfall, HDPE eliminates that need while still meeting Harris County Flood Control District requirements.

The change in contract includes the following:
* 36" HDPE pipe, 115 LF = $19,303.90
* 36" End cap with 15" restrictor, 1 EA = $903.19
* 36" Timber Bent, 1 EA = 3,808.51...