Legislation Details

File #: 25-5127    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 8/13/2025 In control: Commissioners Court
On agenda: 8/26/2025 Final action: 8/26/2025
Title: Transmittal by the Flood Control District of a certificate of substantial completion with Times Construction, Inc, for the Inverness Forest Levee Modifications (Cypress Creek Watershed, Bond ID Z-04, Project K600-01-00-X016, Job No. 24/0157, Precinct 1).
Attachments: 1. K600-01-00-X016 Sub Comp Cert SIGNED.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): K600-01-00-X016
Vendor/Entity Legal Name (if applicable): Times Construction, Inc.

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS

Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a certificate of substantial completion with Times Construction, Inc, for the Inverness Forest Levee Modifications (Cypress Creek Watershed, Bond ID Z-04, Project K600-01-00-X016, Job No. 24/0157, Precinct 1).
end

Background and Discussion:
The Inverness Forest Levee is in the Cypress Creek Watershed and is owned by the Flood Control District. The purpose of this transmittal is to submit the Certificate of Substantial Completion, confirming that the Contractor has fulfilled the scope of work and resolved all punch list items to the satisfaction of the Flood Control District. This levee protects the neighborhood to the south from flooding related to Cypress Creek. This project addressed water intrusion and flow through the levee and eliminates pump station backflows that occur during significant floods. These modifications allow for recertification and subsequent acceptance by FEMA which is ongoing. As a flood protection levee, it must be certified by an Engineer as meeting current standards for flood protection. Periodic recertification of the levee is a requirement of FEMA.

Expected Impact:
Substantial Completion signifies that a flood control project is largely finished, allowing the Flo...