Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 24102MF3AT01
Vendor/Entity Legal Name (if applicable): MBCO Engineering LLC
MWBE Contracted Goal (if applicable): 19.60%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with MBCO Engineering, LLC in the amount of $498,121.60 for professional engineering services in connection with Corridor Study - Milby Street - 2023 - UPIN 24102MF3AT01, Precinct 2, MWBE Contracted Goal: 19.60%.
end
Background and Discussion:
Harris County Precinct 2 (PCT2) has submitted a request to Harris County Engineering Department (HCED) PMO to manage the Milby Street Corridor Study. This project spans approximately 1.32 miles, from Polk Street to Marron Park, and is part of Precinct 2's collaboration with the East End District. The study, aligned with Revive2Thrive vision, aims to enhance safety and improve quality of life by evaluating and upgrading existing infrastructure. The study will focus on assessing roadways, drainage systems, traffic patterns and sidewalk conditions along Milby Street within the project limits.
Expected Impact:
Engaging MBCO Engineering will accelerate the assessment of current roadway, drainage, and pedestrian infrastructure along the corridor. The findings will guide future improvements and ensure integration of pedestrian and bicycle-friendly features, promoting safety and long-term economic growth within the area.
Alternative Options: If no ...
Click here for full text