Legislation Details

File #: 25-4132    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 6/25/2025 In control: Commissioners Court
On agenda: 7/10/2025 Final action: 7/10/2025
Title: Transmittal by the Flood Control District of a certificate of substantial completion with Main Lane Industries, Ltd., for Cloverleaf Area Drainage Improvements (Carpenters Bayou Watershed, Bond ID Z-02, Project ID N100-00-00-E001, Job No. 23/0118, Precinct 2).
Attachments: 1. 071025 TRANSMITTAL SUB COMP N100-E001 PCT 2 backup.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): N100-00-00-E001
Vendor/Entity Legal Name (if applicable): Main Lane Industries, Ltd.

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a certificate of substantial completion with Main Lane Industries, Ltd., for Cloverleaf Area Drainage Improvements (Carpenters Bayou Watershed, Bond ID Z-02, Project ID N100-00-00-E001, Job No. 23/0118, Precinct 2).
end

Background and Discussion:
Cloverleaf Area Drainage Improvements Part 1 includes the installation of the box culvert along Nancy Rose and Hillsboro Street to the property line of the proposed detention basin site, including the box culvert plug and RCP plugs, cast in place/precast concrete inlet structures, ditch regrading and associated culvert and mailbox replacement work on Alderson Street, Force Street, Gainesville Street, Longview Street, and the north half of Barbara Mae Street, Cloverleaf Street, Nancy Rose Street and Manor Street as indicated on the plans designated as Part 1 work. The purpose of this transmittal is to submit the Certificate of Substantial Completion, confirming that the Contractor has fulfilled the scope of work and resolved all punch list items to the satisfaction of the Flood Control District.

Expected Impact:
Substantial Completion signifies that a flood control project is largely finished, allowing the Flood Control District to begin usi...