Legislation Details

File #: 25-4085    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 6/17/2025 In control: Commissioners Court
On agenda: 6/26/2025 Final action: 6/26/2025
Title: Request by the Flood Control District for approval of a Joint Participation Interlocal Agreement between the Harris County Flood Control District and the Cypress Forest Public Utility District for the exchange and development of land to construct stormwater detention basins along Cypress Creek.
Attachments: 1. 25-4085-ILA_HCFCD-Cypress Forest PUD_1253604_2 - rev HC.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Dr. Tina Petersen, Executive Director

Secondary Department: Choose an item.
Secondary Department Head/Elected Official:

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Interlocal Agreement

Project ID (if applicable):
Vendor/Entity Legal Name (if applicable): Cypress Forest Public Utility District

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: Choose an item.

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval of a Joint Participation Interlocal Agreement between the Harris County Flood Control District and the Cypress Forest Public Utility District for the exchange and development of land to construct stormwater detention basins along Cypress Creek.
end

Background and Discussion:
The Harris County Flood Control District and the Cypress Forest Public District (PUD) are seeking to enter into a Joint Participation Agreement involving the exchange of land and construction of stormwater detention basins along Cypress Creek (K100-00-00) to improve drainage and reduce flood risk. Under the agreement, the PUD will convey 65.7 acres to the Flood Control District for stormwater detention while the Flood Control District will transfer 27.2 acres to the PUD.

Following voter approval of a $10 million bond referendum in May 2025, the Cypress Forest PUD will lead the design and construction of up to five detention basins providing approximately 300-acre feet of stormwater storage. Harris County Precinct 3 will oversee project development and ensuring timely coordination and implementation. Upon completion of construction by the PUD, the Flood Control District will assume maintenance of the basins.




Expected Impact:...