Legislation Details

File #: 25-3890    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 6/11/2025 In control: Commissioners Court
On agenda: 6/26/2025 Final action: 6/26/2025
Title: Request for approval to execute an agreement with Binkley & Barfield, Inc., in the amount of $957,588.00 for Professional Engineering Services in connection with Seamist Drive - W 11 Street to Kury Lane - 2023, UPIN 24104MF38301, Precinct 4, MWBE Contracted Goal: 4.2%.
Sponsors: Mony Hossain
Attachments: 1. 25-3890-Award-UPIN 24104MF38301-PSA-Seamist Dr - W 11-Binkley Barfield-P4.pdf
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Lesley Briones
Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 24104MF38301
Vendor/Entity Legal Name (if applicable): Binkley & Barfield, Inc.

MWBE Contracted Goal (if applicable): 4.2%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Binkley & Barfield, Inc., in the amount of $957,588.00 for Professional Engineering Services in connection with Seamist Drive - W 11 Street to Kury Lane - 2023, UPIN 24104MF38301, Precinct 4, MWBE Contracted Goal: 4.2%.
end

Background and Discussion:
This project includes transportation improvements, drainage improvements, public utility improvements including water line and sanitary sewer replacements, street lighting, landscaping and planting additional trees, and a safe pedestrian crossing along both sides of Seamist Drive, between 11th Street and Kury Lane. The proposed transportation improvements will consist of a typical section of a concrete curb and gutter two-lane road with two 12-foot drive. The proposed drainage improvements will consist of providing inline detention storage. These enhancements will improve drainage and address safety issues while bringing the roadway up to current requirements. This agreement will provide Professional Services from the Engineer of Record for the completion of study and design phases.

Expected Impact:
This project seeks to improve transportation and drainage systems and strengthen resilie...

Click here for full text