Title: Request for approval to execute an agreement with Entech Civil Engineers, Inc. in the amount of $783,751.75 for Professional Engineering Services to conduct a feasibility study in connection with Sidewalk - Energy Corridor and Multimodal Connectivity - 2023 - UPIN 24104MF38Q01, Precinct 4, MWBE Contracted Goal: 19.6%.
Attachments: 1. 25-3751-Award-UPIN 24104MF38Q01-PSA-Energy Corridor-Entech-P4_r1
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

Project ID (if applicable): UPIN 24104MF38Q01
Vendor/Entity Legal Name (if applicable): Entech Civil Engineers, Inc.
MWBE Contracted Goal (if applicable): 19.6%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Entech Civil Engineers, Inc. in the amount of $783,751.75 for Professional Engineering Services to conduct a feasibility study in connection with Sidewalk - Energy Corridor and Multimodal Connectivity - 2023 - UPIN 24104MF38Q01, Precinct 4, MWBE Contracted Goal: 19.6%.
end

Background and Discussion:
This goal of this project is to conduct and complete a feasibility study for the design and construction phases of approximately 3.1 LM of sidewalk and safety improvements along Park Row drive, North Dairy Ashford and Dairy Ashford Road. The project includes completing a feasibility study for designing and construction of a 10 foot wide Shared Use Path (SUP) along the North, 6-foot-wide sidewalk along the South, ADA compliant traffic elements and spot improvements along the entire length of the roadway in the project limit .
This agreement will provide Professional services from the Engineer of Record for the completion of study phase.

Expected Impact:
This projects focuses on enhancing the mobility and connectivity options of non-motorized modes between the various land uses and developments in the Energy Corridor District project area by providing safe , eff...