Legislation Details

File #: 25-3202    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 5/9/2025 In control: Commissioners Court
On agenda: 5/22/2025 Final action: 5/22/2025
Title: Request for approval to execute a Crossing and Encroachment Consent with Enbridge, to construct an 8' wide hike and bike trail along Harris County Flood Control Channel and City of Deer Park Right of Way, UPIN 24102MF34A01, Precinct 2.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): 24102MF34A01
Vendor/Entity Legal Name (if applicable): Enbridge

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to execute a Crossing and Encroachment Consent with Enbridge, to construct an 8' wide hike and bike trail along Harris County Flood Control Channel and City of Deer Park Right of Way, UPIN 24102MF34A01, Precinct 2.
end

Background and Discussion:
The project includes the construction of approximately 0.73 mile long, 8' wide Hike and Bike Trail with Concrete. The project limits are from East X St at Battleground Road to East P Street. The proposed sidewalk is running parallel in the existing Texas Eastern Transmission Pipeline 50' wide Easement also Crossing at E San Augustine St. Enbridge has Agreed for the Proposed Harris County Trail and has provided with a Crossing and Encroachment Consent.
Expected Impact:
This action allows the continuation of the proposed work and provides bikers a continues trail from East X St at Battleground Road to East P Street.

Alternative Options:
If no action is taken, the project may experience construction delays, there will be a trail gap at the utility easement, and the intended objective will not be achieved.
County Strategic Plan Goal: 4. Improve physical and mental health outcomes across all communities.
County Strategic Plan Objective: H: Improve the condition and resilience...

Click here for full text