File #: 25-3190    Version: 1 Name:
Type: Report Status: Passed
File created: 5/9/2025 In control: Commissioners Court
On agenda: 5/22/2025 Final action: 5/22/2025
Title: Request for approval of a Study Report prepared by IDS Engineering Group Inc., for Barrett Station (Phase 1 - Dreamland Place) Subdivision Drainage Improvements aka Barrett Station Drainage Improvements Project, UPIN 19102MF17801, Precinct 3.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): 19102MF17801
Vendor/Entity Legal Name (if applicable): IDS Engineering Group Inc

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a Study Report prepared by IDS Engineering Group Inc., for Barrett Station (Phase 1 - Dreamland Place) Subdivision Drainage Improvements aka Barrett Station Drainage Improvements Project, UPIN 19102MF17801, Precinct 3.
end

Background and Discussion:
The project is located on northeast Harris County in the San Jacinto watershed. It is south of Beaumont Freeway and is on either side of the FM 1942 and FM 2100 intersection. The existing conditions for the design system are roadside ditches. The proposed improvements are to regrade and widen roadside ditches, replace culverts, and to construction detention pond(s) for mitigation.

Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation
of structural flood damage to homes in the Barret Station subdivision.

Alternative Options:
If not approved, the project may not be constructed as intended in the study report.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, a...