Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: Not applicable
Regular or Supplemental RCA: Regular RCA
Type of Request: Asset Management
Project ID (if applicable): 21103N301030005
Vendor/Entity Legal Name (if applicable): CenterPoint Energy, Inc. a Texas limited liability company
MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to accept a real estate conveyance of a 0.0141 acre Temporary Construction License from CenterPoint Energy, Inc. a Texas limited liability company, TCL 4 for Peek Road - from 1600' N of the Grand Parkway to 580' S of Clay - 2021 project, and that the County Judge execute the Temporary Construction License Agreement, UPIN 21103N301030005, Precinct 4.
end
Background and Discussion:
The proposed Peek Road reconstruction consists of designing two southbound lanes on Peek Road to upgrade the existing 2 lane portion of Peek Road to a standard four (4) lane concrete boulevard with 32' medians, left turn lanes, and driveways within an existing 100' ROW with storm sewer.
Expected Impact:
The proposed reconstruction improvements will impact proposed driveways that will need to be reconstructed and adjacent property to be regraded.
Alternative Options:
An alternative option is not to construct the concrete boulevard and leave the existing conditions of the road as is.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.